  • The pressure part installation works of cooling tower of a 33.5MW power plant in Mauritius

  • The installation of a 2 X 45MW Power plant at savannah in Mauritius.

  • The installation and commissioning of a HFO tannk (24M diameter X 14.5M height) for VIVO ENERGY in Mauritius.

  • The Fabrication, installation and commissioning of 9 alcohol tank (Capacity respectively 500 m³- 2 nos, 150m³-1 nos, 100m³- 2 nos, 50m³-2 nos,10m³-2 nos) for OBEL distilleries in Mauritius.

  • Installation of pressure parts, non-pressure parts, insulation & cladding works for 1 X 8MW power plant for in Mauritius

  • The installation of a Sugar Cane Juice Tank (Diameter-8 m, Height-6.3 m) for Terra Group of Companies Mauritius.

  • We have provided manpower supply of 82 highly skilled artisans for Addax Makeni from India for their Bio ethanol plant in Sierra Leone on 2012-2014.

  • We have successfully complete the Erection service of 6 MW coal & bagasse based boiler– Medine project - Mauritius , consisting of technically qualified 15 Member team.

  • Fabrication and Supply of Boiler Water wall Panels ( Front, Roof, Side(LHS & RHS), Rear Wall ) - 35 MT APPROX

  • Design, Fabrication and Supply of 2 No's Double skin Diesel tank- 25000 Ltr and 3000 Ltr - Mauritius

  • Installation of Syrup Tank of 335m³ - Capacity - Terra groups - Mauritius-2016-2017

  • Provided manpower supply of 66 highly skilled artisans for Zambia Sugar's from India for their Refinery plant in Zambia 2015-2016

  • Provided 09 highly skilled Coded welders & Fabricators for KWILU NGONGO SUGAR - DRC - CONGO- 2015-2016

  • Provided skilled Artisan for Pipeline installation - Sucrivoire SA - Ivory Coast - 2016-2017